Guided estimation workflow - company, building, quantities, labor, rates, cost summary and the estimate book. Saving creates a project, BOQ and frozen estimate in this browser.
1Company & Project
2Building
3Quantities
4Labor & Equipment
5Rates & BOQ
6Cost Summary
7Review & Save
Company & Project
No company yet? Add one in Companies so the estimate book carries your letterhead.
Plot & Building Configuration
Applies typical plot size, covered % and floors for the selected type - every field stays editable.
Areas recalculate automatically. Construction area drives the auto quantity takeoff in the next step.
Quantities
Uses rule-of-thumb factors for the selected quality level. Adjust any field afterwards.
Grey structure
Item
Quantity
Unit
Excavation
cu ft
PCC
cu ft
Footing concrete
cu ft
Column concrete
cu ft
Beam concrete
cu ft
Slab concrete
cu ft
Steel
kg
Shuttering
sq ft
Brickwork
cu ft
Blockwork
cu ft
Internal plaster
sq ft
External plaster
sq ft
Materials (base + wastage)
Material
Base Qty
Wastage %
Final Qty
Unit
Finishing / Plumbing / Electrical (reference)
Item
Quantity
Unit
Flooring area
sq ft
Paint area
sq ft
Ceiling area
sq ft
Internal doors
nos
Main doors
nos
Windows
nos
Water pipes
ft
Drain pipes
ft
Pipe fittings
nos
Valves
nos
Sanitary fixtures
nos
Faucets
nos
Electrical cable
ft
Conduit
ft
Switches
nos
Sockets
nos
Distribution boards
nos
Lights
nos
Fans
nos
AC points
nos
Labor & Equipment
Standard crew sizes, days and country-based day rates - edit any cell to customize.
Labor (workers × daily rate × days)
Trade
Workers
Daily rate
Days
Total
Labor total
0
Equipment (qty × rate × days)
Equipment
Qty
Rate / day
Days
Total
Equipment total
0
Rates & BOQ
Defaults are indicative for the selected country. Live fetch only reads a public FX rate - nothing is uploaded.
Material
Qty
Unit
Rate type
Rate
Amount
BOQ preview
#
Item
Specification
Quantity
Unit
Rate
Amount
Currency
Cost Summary
Review & Save
Saving stores a project, its BOQ and a frozen estimate in this browser - nothing is uploaded.